# Building an incoming inspection sheet for scratchers

Source: https://koor.pet/news/build-a-scratcher-incoming-inspection-sheet/
Language: en
Environment: production
Content updated: 2026-11-25T04:56:30.305Z

Published website content only. Cite sourceURL. Specifications and MOQ are references; price, lead time and trade terms require a written RFQ. This static snapshot changes only after a successful website release.

Published: 2026-10-27T16:00:19.379Z

Content reviewed: 2026-11-25T05:04:41.258Z

## Sources
- ISO 2859-1 — Sampling procedures for inspection by attributes (AQL) (International Organization for Standardization): https://www.iso.org/standard/1141.html
- ISTA Transit Packaging Test Procedures (1A / 3A) (ISTA): https://ista.org/test_procedures.php

## Related products
- Corrugated Cardboard Scratcher Refill: https://koor.pet/products/cat-scratcher-refill/
- Corrugated Cardboard Cat Scratcher with Holder: https://koor.pet/products/cat-scratcher-with-base/
- Cardboard Cat House and Scratcher: https://koor.pet/products/cat-house-climbing-frame/
- Triangular Corrugated Cardboard Cat Scratcher: https://koor.pet/products/triangle-cat-scratcher/

Build an actionable incoming & pre-shipment QC inspection sheet for corrugated cat scratchers: verify ±1.5 mm dimensions, ±3% golden-sample weight, 9%–12% moisture and ISO 2859-1 AQL limits.

## Content


## Start with the approved reference

Identify the order, model, drawing revision, approved sample and packaging specification. Define who inspects and who decides acceptance. This worksheet is a planning aid; it does not set a sampling standard, acceptance quality limit or certification requirement.

## Create checkable rows

Include identity and quantity, dimensions, appearance, assembly, accessible edges, fixings and packaging. For each row, specify the method, instrument if applicable, agreed tolerance and evidence to retain. Use the approved specification for numeric limits rather than inventing universal tolerances.

## Keep defects traceable

Record carton and sample identifiers, photos, measured results and the person making the observation. Describe the visible issue before assigning a cause. Separate cosmetic findings from functional or potential safety concerns, using categories and escalation rules agreed by the responsible teams.

## Close the inspection with a decision

Document acceptance, hold, rework or replacement as appropriate to the purchase agreement. Link corrective action to the original finding and verify the outcome. Agree sampling and destination-market compliance requirements with qualified parties before shipment; a completed checklist alone does not establish compliance.

## FAQ

### What AQL levels are standard for corrugated cat scratcher inspections?

B2B importers commonly apply ISO 2859-1 General Inspection Level II with Critical 0 (sharp staples, live mold), Major AQL 1.5 (delamination, crushed corners, oversize variance), and Minor AQL 4.0 (light scuffs).

### Which measurements should be checked first on an incoming inspection sheet?

Verify outer length/width/height within ±1.5 mm, unit net weight within ±3% of the golden sample, board moisture within 9%–12%, barcode scannability, and master carton marks.

### Can a buyer share their inspection sheet before mass production begins?

Yes. Submitting your inspection checklist with the RFQ lets the factory align in-process QC gates with your warehouse or third-party inspector before production starts.


## Frequently asked questions

### What AQL levels are standard for corrugated cat scratcher inspections?
B2B importers commonly apply ISO 2859-1 General Inspection Level II with Critical 0 (sharp staples, live mold), Major AQL 1.5 (delamination, crushed corners, oversize variance), and Minor AQL 4.0 (light scuffs).

### Which measurements should be checked first on an incoming inspection sheet?
Verify outer length/width/height within ±1.5 mm, unit net weight within ±3% of the golden sample, board moisture within 9%–12%, barcode scannability, and master carton marks.

### Can a buyer share their inspection sheet before mass production begins?
Yes. Submitting your inspection checklist with the RFQ lets the factory align in-process QC gates with your warehouse or third-party inspector before production starts.

JSON representation: https://koor.pet/ai/en/articles/build-a-scratcher-incoming-inspection-sheet.json
