OEM / ODM

Preparing a private-label scratcher brief

Content reviewed:

Reviewed by: 后台管理员 #1

Editorial and review policy

How to prepare a private-label OEM corrugated cat scratcher RFQ brief: align reference structures, AI/PDF vector dielines, golden sample sign-off gates and comparable FOB/DDP quotation tiers.

Describe the product and the customer

State the target market, sales channel, intended use and preferred current model or drawing. Distinguish a branding change from a change to the structure or material. Attach reference images only when you have the right to use them, and identify what is inspiration rather than an approved design.

Specify artwork and packaging inputs

Provide the brand artwork, required languages, barcode responsibility and intended pack format. Mark dimensions and print areas to be confirmed. Keep source artwork, proof files and revisions together; a screen preview should not silently become a colour or production acceptance standard.

Agree the sample decision points

Ask the supplier to confirm available customisation, sample cost, timing and what the sample represents. Record who approves the structure, finish, artwork and packaging. Keep the approved revision identifiable, and document any difference between a sample and the planned production method.

Make the quotation comparable

Request quantity options, packing assumptions, destination and proposed trade terms. Ask for separate clarification of tooling, artwork and sample charges where applicable. MOQ, price and delivery date require a current written confirmation; this brief does not promise supplier capabilities or fixed commercial terms.

FAQ

What file formats are best for private-label cat scratcher artwork?

Supply vector AI or print-ready PDF files with outlined fonts, 3 mm bleed, and Pantone color callouts so print proofs match your brand palette accurately.

Do I need a new die-cut mold for every private-label project?

No. Applying custom sleeves, color boxes, or side-wrap branding onto existing catalog models avoids structural die-cut tooling charges; new steel-rule dies are only required for custom shapes or dimensions.

When does the approved golden sample take effect?

Once you sign off on the physical sample, it becomes the binding reference for bulk net weight (±3%), outer dimensions (±1.5 mm), print color, and pre-shipment inspection.